Installation Steps for Large double roll Crusher

Time:2023-11-10 From:admin [ Font:Small Middle Big]
Introduction:   Large double roll crusher is commonly used crushing equipment in fields such as mining and construction. Correct installation is crucial for the stable operation and productio...

 Weathered rock  roller crusher

Large double roll crusher is commonly used crushing equipment in fields such as mining and construction. Correct installation is crucial for the stable operation and production efficiency of the equipment.

Installation Steps for Large double roll Crusher

Firstly, choose a suitable installation site. Crushers are typically installed on sturdy concrete foundations to ensure smooth. And firm bases capable of supporting the equipment’s weight and vibrations. Additionally, consider the working environment around the equipment, ensuring proper ventilation, drainage, and safety at the installation location.

Secondly, install the main body of the equipment. Place the main body on the foundation, ensuring it is level, and calibrate using a spirit level. Refer to the installation drawings and manuals to correctly connect conveyor belts, transmission devices, and power lines, ensuring secure and reliable connections.

Next, install the rollers. Assemble the rollers of the crusher onto the frame, paying attention to the installation sequence and direction, ensuring precise coordination of all components. During the installation process, check the gaps and alignment of the rollers to guarantee their normal operation and crushing efficiency.

Then, install safety devices. double roll crushers are typically equipped with various safety devices such as overload protection and leakage prevention. During installation, ensure these safety devices are properly installed and calibrated, enabling them to function effectively during operation, protecting both the equipment and operators.

Finally, conduct trial operation and debugging. After completing the installation, perform trial operation and debugging of the equipment, inspecting its operating status and the performance of various components. Ensure the equipment runs smoothly, without abnormal sounds or vibrations. If any issues are identified, promptly investigate and adjust until the equipment meets the design requirements for performance indicators.

When installing large double roll crusher, strictly follow the manufacturer’s provided installation drawings and operation manuals to ensure the installation work is carried out safely, stably, and efficiently.